Projects
DS Project - Southwestern British Columbia

 In October 2009, the Company entered into an option agreement to acquire a 100% interest, (subject to an NSR) in the DS group of claims located approximately 20km west-south-west of Port Renfrew, a deep-water port on the south-west coast of Vancouver Island.

 

Consideration for a 100% interest in the property is the payment of $50,000 plus 400,000 shares of the company, of which $10,000 plus 100,000 shares was paid upon TSX Venture Exchange approval of the transaction with the remaining share balance becoming payable in 100,000 share increments on the first through third anniversaries of exchange approval. Remaining cash payments become payable as to $10,000 on each of the first through third anniversaries of approval with a final payment of $20,000 becoming due on the fourth anniversary. The property is subject to an NSR of 3% in favor of the vendor, of which the Company has the option to purchase 2 of the 3 percentage points for $500,000 per percentage point, prior to commencement of commercial production.

 

DS Project Drill Core - Updated March 30th - Pictures 10-11

DS Project Drill Core

High Grade Copper & Gold Intersected at DS Project

 

High Grade Copper & Gold Intersected at DS Project

 

The Company is pleased to report that complete assay results, from its initial core drilling program at the DS Property, on Vancouver Island, have now been received.

 

The most significant results of the five hole program are in drill hole DDH-DS-10-05, which was drilled from the DS-1 Pit at -45 degrees on an Azimuth of 015 degrees.  DS10-05 intersected 41.5 metres with multiple stages of brecciation and sulphide deposition consisting of pyrite, chalcopyrite, pyrite, bornite and native dendritic copper.

 

2010 Phase 1 Significant Drill Intercepts

  

Interval

Width (m)

Width (ft)

% Cu

g/t Au

  DS-10-05

10-49

 

 

0.93

0.71

39.0 m

128.0

Including

23-49

26.0 m

85.0

1.2

0.9

Including

35-49

14.0 m

45.9

2.19

1.7

Including

39-49

10.0 m

32.8

3.06

2.4

Including

44-49

5.0 m

16.4

6.06

4.73

Including

47.4-48.3

0.9m

3.0

20.8

17.87

 DS-10-02

1.1-5.8

4.7m

15.4

0.39

0.16

 DS-10-03

1.8-9.5

7.7m

25.3

0.85

0.36

Including

5.0-9.5

4.5m

14.8

1.16

0.25

 DS-10-04

2.6-5.5

2.9m

9.5

0.71

0.53

Including

2.6-3.6

1.0m

3.3

1.8

1.02

DS-10-01

The hole did not reach target depth and was abandoned. 

 

True widths of mineralized zones are not yet known.

 

Drills holes DS-10-02 to 04 were drilled proximal to the DS-1 Pit to interpret geological structure and orientation of mineralized zones.

 

 

 

The DS property is located on Vancouver Island, in a region that can be worked year round. The area that has been logged in recent years, leaving left an extensive network of high quality access roads suitable for heavy haulage. The discovery is close to tidewater and deep water ports.

 

Exploration at the DS Property is expected to recommence forthwith. The next planned stage will include additional diamond drilling of geophysical targets, additional detailed geophysical surveys within the established grid area and expansion of the existing grid to facilitate further geophysical surveys on extensions from the newly discovered mineralized zone. Also, two additional surface mineralized zones have been located and will be targeted for geophysical surveys with follow-up diamond drilling if warranted.

 

Company President Ralf Hillebrand states: "The company's strategy of searching for VMS deposits in a politically secure region with good year round transportation access and infrastructure has paid off.  Our discovery of high grade copper and gold in a period of high metal prices sets the stage for New  Shoshoni to expand its exploration program  significantly."

Core samples were processed by Acme Laboratories, an ISO accredited facility located in Vancouver BC, for assay analysis by atomic absorption and metallic screen using a sample size of 500 grams.

 

Glen Macdonald P.Geol., a Qualified Person under NI43-101 has reviewed and approved the technical content of this News Release.

 

Additional information on New Shoshoni including pictures of representative sections of drill core is available for viewing on the Company's website at http://www.newshoshoni.com .

 

 

  

NEW SHOSHONI VENTURES LTD.

 

Ralf Hillebrand

President

  

For more information, please contact Mark Tommasi at 604-608-6314 or toll free at 1-877-454-0383.

  

  

 

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this news release.

 

DS Copper - Gold Property

DS Copper - Gold Property

Sunrise - Natural Gas Project, Northern British Columbia

As October 16th 2007 New Shoshoni Ventures Ltd. entered into an agreement with ABI Resources Ltd. of Calgary Alberta (the "Farmor"), whereby the Company may earn a 65% interest in up to four contiguous Sections prospective for the discovery of natural gas. The properties are located in the Sunrise area of Northern British Columbia. ABI currently holds a 100% pre-farmout interest in these lands under Crown Licenses.

LATEST NEWS RELEASES
STOCK INFO TSX-V : NSV.V
Last Trade 0.115
Date/Time 7/29/2010 - 3:43pm
Change +0.015
Day Range 0.115 - 0.10
Volume 50000
JOIN OUR MAILING LIST
Email :
SEARCH ARTICLES
COPYRIGHT 2007